After spending another week with Knex to build a bridge, I believe that it is harder than I first assumed. First of all, it was difficult to choose which design or method the team will use to create the bridge because there are numerous different options. In addition, while building the bridge we encountered several problems, such as the parts not fitting with the design due to the limited sizes available. As we moved on fixing the problems, at the end it resulted with a very expensive bridge. The most important observation we saw about the Knex pieces is the 180 groove gussets. The most common procedure is to combine two of the 180 groove gussets to able to create a rectangular prism structure, but it turned out to be very expensive and unstable. Our bridge, which contained numerous 180 groove gussets, was extremely weak and unreliable even though it was expensive. Therefore, it is very important to understand all of the Knex pieces and use them efficiently. In West Point Bridge Design, all the parts played similar role, but the gussets were not as important as they are in Knex. In addition I realized that in WPBD, increasing the cost will increase that strength ratio, which does not occur with knex pieces.
Last week in lab, the groups were allowed to build a bridge based on their design from the A1 assignment using Knex pieces. My group decided to build one bridge as a team effort and incorporate everyone’s ideas. Our bridge was structured in a small rectangular prism with triangles as the web. It contained numerous pairs of 180 grooved gussets, which turned out to be unreliable. This week in lab, each group will test their final outcome of knex bridge and try to analyze how it fails.
Discussing the aspects of Bridge Design Process and understand the issues that will engage in the field of designing large structures.
Tuesday, May 8, 2012
Wednesday, May 2, 2012
Week 5: WPBD vs. KNEX
In the last weeks class, we started to build a truss bridge of our own with the KNEX. Unlike the weeks prior to where we used the WPBD. Both ways a vastly different from each other, one it utilized on the computer and the other is hand made. Therefore calculations on the bridge are alot harder when done by hand. Therefore alot more time consuming, unlike WPBD that would run throught the calculations in a second.
Unlike WPBD with the KNEX we were able to do anything we felt. We were not limited to gusset constrains even though there were other constraints. Also building the bridge by hand gives us a more hands on approach to the actual things physical factors that affect the bridge and its sustainability over time. Once we get a grasp on the how the bridge can be affected, we can build a stronger bridge. Unlike WPBD that did not tell us how the bridge had uneven weight distribution, we simply just swapped a pipe out to make it stronger, not knowing exactly how it did so.
Tuesday, May 1, 2012
Week 5: WPBD - Knex
During the past weeks, the students have been introduced to two different methods of designing and constructing a truss bridge. Although there are similarities in the two methods, each method demonstrates different aspects of engineering. The West Point Bridge design software allowed the students to comprehend the mechanism involved in designing a truss bridge. Similarly, designing the bridge using Knex provided the students to visualize the structural behavior included in the designing an actual bridge. Along with that, both methods express the budget factor that plays an important role in the designing process.
The major difference between these two methods would be that West Point Bridge Design software has a limit to the types of gussets used to connect membranes while the Knex method limits types of materials and their thickness to construct the bridge. In my perspective, WPBD software is very time efficient and more convenient in regards to restructure and rearrange the design of the bridge calculating the cost of the bridge. The software also allows the students to quickly calculate the cost of the bridge, while the Knex method requires the students to calculate everything using excel file. In addition, the Knex method provides more hands on experience the assembling of the truss bridge. Overall, both methods serve as a great guide to comprehending the engineering aspects convoluted in designing process.
During the previous week in class, we discussed the constraints that need to be considered in building the final design. We also received an overview of the assessment that each bridge will have to undergo during the final week. For the rest of the class, the group decided to work together in designing a “real” truss bridge using Knex. For next week, each group member will have a blueprint of their own unique design including the details of materials involved in the construction.
A2-JACOB
| Bill of Materials |
| Elevation Image |
| Plan Image |
My initial objective was to construct a truss bridge that
satisfied all the design constraints and had the best price to weight. I
realized that the best way to start the design is by applying what I learned so
far. Therefore, my objective shifted to building the simplest design with
smallest membranes that followed the same truss pattern as the one I designed
on the WPBD software. To build 8" wide flat portion on the top of the bridge, I decided to remove the arc that I
previously designed on the software. My initial designed consisted of blue and white
long chords because I recognized that shorter beams are more stable than longer
beams. My initial design of the bridge was expensive and totaled over $350,000.
During the designing process, I was able to
cut down the price significantly. I recognized that one yellow long chord going
diagonal was efficient and cheaper than having two white chords connected with
a gusset plate going diagonal. By replacing the white chords with one yellow
chord enabled me to lower my price range to $277,500. The basic outline of the bridge
didn’t experience any change and remained as a trapezoid with the long base that
spanned 2 feet and 1/8 inches with a height of 3.125 inches. This assignment
was a great learning experience as well as a great hands-on experience on how
real designing work. The assignment also taught me the importance of making accurate
measurements and keeping a record of the progress of the design. Overall, this
assignment was a great way to understand the engineering aspects involved in designing
a bridge.
Week 5: WPBD - Knex
After Transitioning from WPBD and into Knex for designing a bridge, I realized that WPBD is much easier and different than Knex. In WPBD we did not have to face problem with dimensions or the materiel size. Students were allowed to create beams from any point to another point and than allowed to just test the bridge to observe the results. With Knex we only have few options to choose from to bulid our bridge and also have to take in considerastion which part fits with other parts. For example, depending on the outer frame of the bridge, only a certain bars or design can be used to create the 'web'. In the Knex's kit we have to choose from the different collored beams accoriding to size, such as white, blue, yellow, red, and gray; in addition with the types of gussets. The main difference between WPBD and Knex is the lack of helpful feed back WPBD provided on the tension and concentration or each material.Both West Point Bridge Design and Knex are excellent tools for
engineers to understand how professionals design real structures. It is a
tool that helps visualize structural behavior and also an opportunity to
experience the design process.
Last week in lab we were introduced to Knex and allowed to play with them get a good understanding. The first thing done was a presentation which gave details and constrains for the bridge competition. I was able to realize what my bridge needs to accomplish and how it should be design to meet the constraints of the competition. Furthermore, the presentation informed the class about the different Knex parts and how much each will cost. At end we were allows to play with the Knex to get a good feel of how the bridge will be. This week in lab we will work more with the Knex pieces and attempt to Build a bridge for the competition.
Last week in lab we were introduced to Knex and allowed to play with them get a good understanding. The first thing done was a presentation which gave details and constrains for the bridge competition. I was able to realize what my bridge needs to accomplish and how it should be design to meet the constraints of the competition. Furthermore, the presentation informed the class about the different Knex parts and how much each will cost. At end we were allows to play with the Knex to get a good feel of how the bridge will be. This week in lab we will work more with the Knex pieces and attempt to Build a bridge for the competition.
A2 - Parth Patel
Wednesday, April 25, 2012
Week 4: WPBD
West point bridge design program is an excellent novel program that aids in bridge designing. It helps the student understand the physics behind a bridge and the constraints that go behind building one. gravity, fluctuating weight distribution, how the weight of the bridge itself comes into affect. WPBD gives you a plethera of options on what to build the bridge with but the our assignment was to build the most cost effective bridge. The group as a whole was forced to brainstorm and methodically weigh our options, according to the constraints of building the bridge and out budget.
WPBD does not accurately portray the full range of affects on a bridge, while a bridge may last in WPBD, it is not necessary that it will last at all in reality, yes, WPBD does take into some of the natural affects on a bridge but it cannot accurately portray all of them. A real civil engineer would need to do countlessly more calculations.
Last week in class we compared the groups individual designs, and created one design that we thought worked best and was the most cost effective design. What, we learned is that for bridge to work, it doesn't have to be complex, but rather simple. Smaller rods with a solid steel rod outer and a hollow rod inner works alot better than a full solid steel rod bridge, it also costs alot less. We all came together with what we knew individually and created a bridge we thought was best of all worlds. This week we will start to build our bridge that we designed with KNEX..
Subscribe to:
Posts (Atom)

